The revised bZ4x will come in three powertrain options, at least in the EU, all with new battery packs. There's a 165 hp (123 kW) front-wheel drive version coupled to a smaller-capacity 57.7 kWh ...
INDORE: More than 6,500 kg of toxic waste from Bhopal's defunct Union Carbide factory has been incinerated under the third ...
As part of the plan to dispose of a total of 337 tonnes of waste from Union Carbide factory, the site of the 1984 industrial ...
Over 6,500 kg of toxic waste from Bhopal's Union Carbide factory was safely incinerated in Pithampur, Madhya Pradesh. The ...
The Dow Chemical Company ("TDCC"), a wholly owned subsidiary of Dow Inc. (NYSE: DOW), today announced the early results of ...
In today’s headlines, Ukrainian President Zelenskyy is on a mission to Saudi Arabia, while the EU and India commence pivotal ...
The third trial incineration of Union Carbide India Limited's (UCIL) hazardous waste was successfully conducted between March 10 and 12, as per the Madhya Pradesh Pollution Control Board (MPPCB). This ...
The second trial incineration of the Union Carbide waste, the remains of the 1984 Bhopal gas tragedy, in the Pithampur ...
Emission levels are within permissible limits, air quality data from other equipment installed in different areas are being ...
The second round of trial incineration of Union Carbide factory waste has begun in Pithampur, with 10 tons to be burnt, ...
Union Carbide's toxic waste disposal trial in Madhya Pradesh's Pithampur, with real-time monitoring of emissions and air ...
“The second phase of trial incineration to burn 10 tonnes of Union Carbide waste is underway at the Pithampur waste disposal ...
Some results have been hidden because they may be inaccessible to you
Show inaccessible results